Have Any Question

0822-5801-3177

Email

info@servistamapro.com

Product

Mining Loader

Offering 6-12tons opencast mining loader, 2-3tons underground mining loader, side tipping loader and stone forklift loader. It has the advantages of super heavy load, solid structure, stable and reliable, energy saving and high efficiency.

Mining Loader LW1200KN

  • Bucket Load(m³): 6.5
  • Rated Load(kg): 12000
  • Rated Power(kw): 418

Mining Loader LW1100KV

  • Bucket Load(m³): 6.5
  • Rated Load(kg): 11000
  • Rated Power(kw): 291

Mining Loader LW800KN

  • Bucket Load(m³): 4.5
  • Rated Load(kg): 8000
  • Rated Power(kw): 261

HYDRAULIC EXCAVATOR

Offering serialized and large-scale mining excavation equipment to meet the different needs of various mines. With perfect matching, strong excavation power and efficient operation ability, it has won customers’ favor.

Mining Exacavator XE 7000

  • Operating weight(kg): 673000
  • Engine power(kW/rpm): 2×1193/1800
  • Bucket capacity(m³): 30-36

Mining Exacavator XE 3000

  • Operating weight(kg): 285000
  • Engine power(kW/rpm): 1193/1800
  • Bucket capacity(m³): 12-17

Mining Exacavator XE 2800E

  • Operating weight(kg): 280000
  • Engine power(kW/rpm): 1200/1500
  • Bucket capacity(m³): 12-17

Mining Exacavator XE1200

  • Operating weight(kg): 115000
  • Engine power(kW/rpm): 567/1800
  • Bucket capacity(m³): 7

Mining Exacavator XE900D

  • Operating weight(kg): 89600
  • Engine power(kW/rpm): 399/2100
  • Bucket capacity(m³): 4.1-7

Mining Exacavator XE700D

  • Operating weight(kg): 69000
  • Engine power(kW/rpm): 336/1800
  • Bucket capacity(m³): 2.4-4.6

Mining Exacavator XE750D

  • Operating weight(kg): 75000
  • Engine power(kW/rpm): 403/2100
  • Bucket capacity(m³): 3.8-5.3

Mining Exacavator XE950D

  • Operating weight(kg): 93000
  • Engine power(kW/rpm): 522/2000
  • Bucket capacity(m³): 4.6-7

Mining Exacavator XE950G

  • Operating weight(kg): 91000
  • Engine power(kW/rpm): 447/2000
  • Bucket capacity(m³): 6

Mining Exacavator XE1250

  • Operating weight(kg): 115000
  •  Engine power(kW/rpm): 567/1800
  • Bucket capacity(m³): 5.2-8.5

Mining Exacavator XE2000

  • Operating weight(kg): 192000
  • Engine power(kW/rpm): 810/1800
  • Bucket capacity(m³): 8-12

Mining Exacavator XE2000E

  • Operating weight(kg): 192000
  • Engine power(kW/rpm): 610/1480
  • Bucket capacity(m³): 8-12

RIGID DUMP TRUCKS

As a large-scale mine transportation equipment, it is matched with mining excavators to effectively improve mining capacity, efficiency and reduce costs.

Mining Dumper XDE200

  • Vehicle total mass(kg): 320000
  • Loading capacity(kg): 180000
  • Curb weight(kg): 140000

Mining Dumper XDE240

  • Vehicle total mass(kg): 395000
  • Loading capacity(kg): 23000
  • Curb weight(kg): 165000

Mining Dumper XDE320

  • Vehicle total mass(kg): 510000
  • Loading capacity(kg): 300000
  • Curb weight(kg): 210000

Mining Dumper XDE400

  • Vehicle total mass(kg): 623000
  • Loading capacity(kg): 363000
  • Curb weight(kg): 260000

Mining Dumper XDA30

  • Load capacity(kg): 30000
  • Kerb weight(kg): 26700
  • Max. speed(km/h): 49

Mining Dumper XDE130

  • Vehicle total mass(kg): 85000
  • Loading capacity(kg): 12000
  • Curb weight(kg): 205000

Articulated Dump Trucks

articulated trucks haul a wide spectrum of material in a variety of applications and ground conditions. Simple operation and automotive style comfort along with combined service points and extended service intervals mean these dump trucks let you focus on your work spending less time and money on servicing.

Mining Dumper XDA45

  • Load capacity(kg): 39000
  • Kerb weight(kg): 29500
  • Max. speed(km/h): 45

Road machinery

Road machinery means a piece of mobile machinery or equipment not covered by s. 341.26 (1) (d), such as ditch digging apparatus, power shovels, drag lines and earth−moving equip- ment, or a piece of road construction or maintenance machinery, such as asphalt spreaders, bituminous mixers, bucket loaders, ditchers, leveling graders, finishing machines.

GR3005

GR2605

GR3505

0 +

Completed Projects

0 +

Happy Client

0

Awwards Winning

0

Professional Team

Our Work Process

Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium totam rem aperiam

Consultation Project

Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusant

Project Planing

Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusant

Execution Project

Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusant